Genecigs Corporate · Rent & Colocation

Capacity online in weeks, not quarters.

Skip the capex. Reserve power-ready racks, private cages, or dedicated GPU clusters in our partner facilities — provisioned with the hardware you spec, billed on a term that fits your roadmap, scaled up or down as you go.

  • WeeksTypical time to live
  • U → cageRent any footprint
  • No capexOperating cost only
  • 24/7Remote hands & NOC

Is renting right for you?

When renting wins

Renting is the fastest path to running compute. It fits when you need capacity now, when demand is still being validated, when you want to avoid tying up capital, or when you need to burst for a project and scale back after. Many clients start here and move to an owned build once their footprint is proven — and we run that build for them too.

  • You need compute live in weeks
  • You'd rather not carry the capex
  • Your demand may grow — or shrink
  • You want someone else handling power, cooling & hands

Footprints

Rent exactly what you need

[ BY THE U ]

Rack units

A few rack units for edge nodes or a small footprint, in a shared, secured rack.

[ BY THE RACK ]

Full racks

Dedicated racks at the power density you specify, air or liquid-assisted.

[ BY THE CAGE ]

Private cages

Physically separated, access-controlled space for multi-rack deployments.

[ GPU CLUSTER ]

Dedicated AI clusters

Bare-metal NVIDIA, AMD, or Intel nodes with a low-latency fabric, ready to serve or train.

In every contract

What's included

[ POWER ]

Resilient power

Conditioned, UPS-backed supply with N+1 or 2N redundancy and generator backup.

[ COOLING ]

Cooling to density

Air, rear-door, or liquid-assisted cooling matched to your rack power.

[ NETWORK ]

Connectivity

Carrier-neutral cross-connects, IP transit options, and low-latency regional reach.

[ HANDS ]

Remote hands

24/7 on-site technicians for reboots, swaps, cabling, and installs.

[ SECURITY ]

Physical security

Access control, CCTV, and audit logging, documented for ISO 27001 / SOC 2 scopes.

[ VISIBILITY ]

Live telemetry

Per-rack power, thermal, and PUE metrics streamed to your team in real time.

From request to running

Four steps to live

Indicative timing for standard footprints. Dedicated GPU clusters depend on hardware availability, which we confirm up front.

  1. 01

    Scope

    Days

    We capture your power, density, hardware, location, and term, then confirm what's available and where.

  2. 02

    Reserve

    Days

    Space and power are reserved, terms agreed, and any hardware ordered or allocated.

  3. 03

    Provision

    1–3 weeks

    Racks powered and cabled, hardware installed and burn-in tested, connectivity and access set up.

  4. 04

    Go live

    Ongoing

    You get access, credentials, and telemetry. Scale up or down as your demand changes.

Commercials

Terms that flex with you

Term length

  • Monthly rolling
  • Annual
  • Multi-year reserved (best rate)

Billing basis

  • Per U / per rack / per cage
  • Per kW of power
  • Per node for GPU clusters

Scaling

  • Burst capacity for projects
  • Add racks as you grow
  • No stranded, idle hardware

Pricing depends on footprint, power density, hardware, location, and term — send your requirements below for a tailored quote.

Capacity request

Tell us what to provision

Fill in what you know — leave the rest to us. Submitting opens your email client with the details ready to send.

Opens your email app addressed to hello@genecigs.com.au

Outgrowing rented capacity?

Once your footprint is proven, we can design and build a facility you own — and keep running it for you. Renting now doesn't lock you out of building later.